Project Detail
Total SQFT
7,500.00
Date Completed
05/12/2025
Worked Time
12 weeks
The Ground Load Facility (GLF) at San Antonio International Airport (SAT) is a new two-story addition to Terminal A, introducing three additional ground gates and bringing the airport’s total gate count to 29. Designed to accommodate increasing passenger volume—especially for both domestic and international travel—the GLF is scheduled for completion in March 2025.
This project was developed in collaboration with Binswanger Glass.
General Contractor: Hensel Phelps Construction.
© City of San Antonio
A sample of work from 823 Drafting Studio for this project:
SAT - GLF
9800 Airport Blvd, San Antonio, TX 78216
© City of San Antonio
SAT - GLF
© City of San Antonio