Project Detail

San Antonio International Airport - GLF

Total SQFT

7,500.00

Date Completed

05/12/2025

Worked Time

12 weeks

The Ground Load Facility (GLF) at San Antonio International Airport (SAT) is a new two-story addition to Terminal A, introducing three additional ground gates and bringing the airport’s total gate count to 29. Designed to accommodate increasing passenger volume—especially for both domestic and international travel—the GLF is scheduled for completion in March 2025.

               

Scope of Work:
  • Production of Exterior Shop Drawings
  • Production of BIM Modeling
  • Production of Material Takeoff

               

This project was developed in collaboration with Binswanger Glass.

General Contractor: Hensel Phelps Construction.

               

© City of San Antonio

               

               

A sample of work from 823 Drafting Studio for this project:

                              

  • Elevation / Shop Drawings

                                               

  • Details / Shop Drawings

               

  • BIM Modeling - LOD 350

SAT - GLF

9800 Airport Blvd, San Antonio, TX 78216

© City of San Antonio

SAT - GLF

© City of San Antonio